- Title
- Planned energy cable Italy-Slovenia
- Abstract
Planned Energy cable connection between Italy and Slovenia.
This infrastructure is part of the PCI (Project of Common Interest) Italy – Slovenia interconnection between Salg areda (IT) and Divača - Bericevo reg ion (SI).
The cable path is not official and only approximate.
Commissioning date: 2022- Publication Date
- June 26, 2015, 4:35 p.m.
- Type
- Vector Data
- Keywords
- cable , Energy
- Category
- Energy
- Hydrocarbon, Wind Farms, Oil and Gas
- Owner
- CNR-ISMAR
- Maintenance Frequency
- Frequency Of Maintenance For The Data Is Not Known
- Restrictions
- This layer can't be used for any purposes without the written permission of the owner.
- Purpose
To show the approximate path of the planned energy cable.
- Language
- English
- Data Quality
The cable path was digitalized starting from a jpg image.
- Supplemental Information
Development of interconnection, will allow better integration of the Italian electricity grid with that of other countries, in Europe, resulting in a strengthening of the overall system and an improvement of the current security and optimize plant utilization.
Additional information: https://ec.europa.eu/energy/sites/ener/files/documents/pci_3_21_en.pdf- Spatial Representation Type
- vector data is used to represent geographic data
Comments (0 total)
Log in to add a comment